A Structured, Transparent
Engineering Methodology

Precision is never accidental. Our 6-stage engineering and quantity surveying process combines computational simulations, BIM LOD 400 clash-free modeling, and multi-tier QA/QC auditing to deliver construction-ready packages with zero site interference.

6 Sequential Stages
100% Clash Interference Zero
ISO 19650 BIM Process Alignment
3-Tier QA/QC Peer Review

The 6 Stages of FNCS Delivery

A clear breakdown of how our teams transform architectural intent and RFP requirements into clash-free digital twins and accurate Bill of Quantities.

01 PHASE

Project Inception & Feasibility

We review the Basis of Design (BOD), client requirements, site utility availability, municipal authority regulations (JEA / Saudi Building Code), and project schedules to define clear milestone targets.

Phase Deliverables:
  • Project Execution Charter
  • BIM Execution Plan (BEP)
  • Scope Matrix & Turnaround Timetable
02 PHASE

Computational Physics & Calculations

Senior discipline leads calculate thermal peak loads in Carrier HAP, perform short-circuit fault simulations in ETAP, run DIALux lighting models, and size hydraulic water/sprinkler piping networks.

Phase Deliverables:
  • Carrier HAP Hourly Peak Reports
  • Electrical Single-Line Diagrams (SLD)
  • Hydraulic Booster & Pump Head Sizing
03 PHASE

BIM LOD 300 to LOD 400 Digital Twin

Our Revit specialists model every duct run, piping riser, electrical cable tray, and piece of mechanical plant with manufacturer-grade geometry (LOD 400) using custom pyRevit automation scripts.

Phase Deliverables:
  • Autodesk Revit Central 3D Model
  • Parametric MEP Equipment Families
  • pyRevit Automated Annotation Sheets
04 PHASE

Navisworks Clash Matrix Resolution

The MEP model is federated against structural concrete/steel and architectural finishes in Navisworks Manage. We detect and resolve all spatial collisions, guaranteeing 100% clash-free installation.

Phase Deliverables:
  • Navisworks Zero-Clash Verification Report
  • Builders' Works Opening (BWO) Sleeves
  • Interdisciplinary Coordination Matrix
05 PHASE

Parametric MTO & Standardized BOQ

Certified quantity surveyors extract precise bill of quantities structured according to CSI MasterFormat 16/50 divisions or POMI standards, generating zero-waste cut-lists for duct and pipe procurement.

Phase Deliverables:
  • Material Takeoff Cut-Lists (MTO)
  • Itemized BOQ (CSI / POMI)
  • Tender Cost Estimate & Rate Breakdown
06 PHASE

Tender Handover & Site QA/QC Support

Final issuance of IFC drawing packages, municipal civil defense submittal dossiers, contractor tender query support, and ongoing site supervision audits to ensure faithful execution.

Phase Deliverables:
  • Issued for Construction (IFC) Drawings
  • Fabrication Spool Drawing Packages
  • RFI Responses & Technical Site Support

Our 3-Tier QA/QC Protocol

Every sheet and report passes through three rigorous audit layers before client delivery, guaranteeing absolute code compliance and eliminating design errors.

Tier 1: Discipline Lead Audit

Each discipline lead (HVAC, Electrical, Plumbing, Fire) conducts line-by-line verification of calculation inputs, design margins, and code references against ASHRAE, NFPA, and SBC codes.

Tier 2: Interdisciplinary Peer Review

Independent cross-discipline audit verifying structural ceiling clearances, electrical panel connections for mechanical chillers, and hydraulic pump power loads.

Tier 3: Principal Partner Sign-Off

Senior consulting principals review the total engineering package, verifying constructability, tender budget alignment, and client specifications before final stamped release.

Experience the FNCS Engineering Standard

Let us walk you through our methodology on your upcoming project or tender.

Request Technical Consultation
Document: FNCS_Prequalification_2026.pdf
Size: 18.4 MB (High-Res Vector)
Accreditation: Jordan Engineers Association & Saudi Council of Engineers
Click to upload or drag & drop your CV Accepted formats: PDF, DOC, DOCX (Max 15MB)